Loading

 
 

We have been a partner with the Therme Erding since 2005, the largest indoor waterpark in the world attracting almost 2 million guests per year. During that time we have gained a lot of know how when it comes to planning and executing indoor waterparks. We are capable of planning and executing the maximum number of attractions in the minimum amount of space, to optimise the sequence of events, finding a balanced mix of adrenaline and capacity. All of that whilst always making sure that the safety of each individual element as well as the whole project is not compromised in any way, shape or form. In close co-operation with our customers we develop custom solutions that will last a long time. If you are planning a new project or if you want to expand and add to an existing project, then we are more than happy to assist and advice you long before the start of production. 

How do we develop a waterpark?

 

(Project and planning preparation)

Determining the prerequisites to cope with the construction tasks by planning, including all the required sections, elevations and plans in scale 1:1000 and 1: 500

• Design Description
• Proposed Waterpark Program
• Key Data
• Cost Estimation
• 3D-Model plus Visualization
• Physical Model (Scale 1:1000)

 

(system and integration planning)

Establishing the final solution to the planning task including all the required sections and elevations and plans in scale 1:500, 1: 200 and 1:100

• Design Description
• Key Data
• Final Waterpark Program
• Cost Calculation
• Modification 3D-Model plus Visualization
• Physical Model (Scale 1:500)

Establishing and presenting of the planning solution mature for execution, including all the required sections, elevations and plans in scale 1:100 and 1:50, as well as main details in scale 1:20, 1:10.

• Key Data
• Detailed Cost Calculation